Roadworks location
Main Road - Subduct, Test Rod and Rope required between plotted points. Excavation required to clear any blockages found.
Roadworks description
Roadworks scheduled 12/11/2025 - 14/11/2025 (Fibrus Networks Limited)
Roadworks start time
Roadworks end time
Roadworks delays
longDelays
Roadworks organisation
Fibrus Networks Limited
Roadworks link
Roadworks comment
Traffic control (multi-way signals)