Roadworks location
Barras Lane - 27m TRACK / 2 TOBIES & Cabling works
Roadworks description
Roadworks scheduled 12/11/2025 - 14/11/2025 (Fibrus Networks Limited)
Roadworks start time
Roadworks end time
Roadworks delays
longDelays
Roadworks organisation
Fibrus Networks Limited
Roadworks link
Roadworks comment
Traffic control (two-way signals)