Roadworks location
Lowca Lane - Test Rod and Rope, and excavation required to clear blockages found under bridge beside school, O/S house 15, O/S house 25, O/S house 27
Roadworks description
Roadworks scheduled 12/11/2025 - 14/11/2025 (Fibrus Networks Limited)
Roadworks start time
Roadworks end time
Roadworks delays
longDelays
Roadworks organisation
Fibrus Networks Limited
Roadworks link
Roadworks comment
Traffic control (multi-way signals)