Roadworks location
Whitestiles - Exavate in footway to lay duct and install laterals OS 73 - 78 & Opp 79 - OS 84
Roadworks description
Roadworks scheduled 19/09/2025 - 23/09/2025 (Fibrus Networks Limited)
Roadworks start time
Roadworks end time
Roadworks delays
longDelays
Roadworks organisation
Fibrus Networks Limited
Roadworks link
Roadworks comment
Traffic control (two-way signals)