145438011

Roadworks location
Waverton Village - Test, rod, cable and splice existing underground network on behalf of Fibrus (blockage clearance if required)


Roadworks description
Roadworks scheduled 25/09/2025 - 08/10/2025 (Fibrus Networks Limited)
Roadworks start time
Roadworks end time
Roadworks delays
veryLongDelays
Roadworks organisation
Fibrus Networks Limited
Roadworks comment
Traffic control (multi-way signals)