Roadworks location
The Green - Excavate to replace existing 6in PVC main with 160mm PE main and transfer existing services
Roadworks description
Roadworks scheduled 16/09/2025 - 05/12/2025 (United Utilities Water)
Roadworks start time
Roadworks end time
Roadworks delays
veryLongDelays
Roadworks organisation
United Utilities Water
Roadworks link
Roadworks comment
Traffic control (multi-way signals)