Roadworks location
Kirkland Road - Excavation to install x1 chamber, 8m of track in CW, and 20m of track in GV
Roadworks description
Roadworks scheduled 29/10/2025 - 31/10/2025 (Fibrus Networks Limited)
Roadworks start time
Roadworks end time
Roadworks delays
longDelays
Roadworks organisation
Fibrus Networks Limited
Roadworks link
Roadworks comment
Traffic control (two-way signals)