Roadworks location
Glasson To Junction With Whitrigg To Bowness On Solway At Guard House - Excavation to install 2m of track in verge
Roadworks description
Roadworks scheduled 10/11/2025 - 14/11/2025 (Fibrus Networks Limited)
Roadworks start time
Roadworks end time
Roadworks delays
longDelays
Roadworks organisation
Fibrus Networks Limited
Roadworks link
Roadworks comment
Traffic control (two-way signals)