Roadworks location
Chapel Street - Excavation to remove blockage and installation 57m of duct
Roadworks description
Roadworks scheduled 01/04/2026 - 03/04/2026 (Fibrus Networks Limited)
Roadworks start time
Roadworks end time
Roadworks delays
longDelays
Roadworks organisation
Fibrus Networks Limited
Roadworks link
Roadworks comment
From outside Sun Sch to outside the Fire Station