149137906

Roadworks location
Chapel Street - Excavation to remove blockage and installation 57m of duct


Roadworks description
Roadworks scheduled 01/04/2026 - 03/04/2026 (Fibrus Networks Limited)
Roadworks start time
Roadworks end time
Roadworks delays
longDelays
Roadworks organisation
Fibrus Networks Limited
Roadworks comment
From outside Sun Sch to outside the Fire Station