Roadworks location
Victoria Place - Install 1 x 25mm and 1 x 63mm PE new water connection to the 90mm main & 5x shortsided disconnection of old lead supply and replace with new connections.
Roadworks description
Roadworks scheduled 09/05/2026 - 18/05/2026 (United Utilities Water)
Roadworks start time
Roadworks end time
Roadworks delays
veryLongDelays
Roadworks constriction
lanesBlocked
Roadworks organisation
United Utilities Water
Roadworks link
Roadworks comment
outside 9-17-CA1 1EJ