Roadworks location
B5307 Raby Grange To Newton Arlosh - Excavation to install 3 x poles in grass verge.
Roadworks description
Roadworks scheduled 16/05/2026 - 18/05/2026 (Fibrus Networks Limited)
Roadworks start time
Roadworks end time
Roadworks delays
longDelays
Roadworks organisation
Fibrus Networks Limited
Roadworks link
Roadworks comment
From the Junction of B5307 with ZU2023 to approx. 250m South-West of Holme Rigg