Roadworks location
Road Leading From Scotby To Wetheral Pasture - Install 9m of underground duct in verge. Install 600m of 60 fibre underground cable and 3 overhead spans of 12 fibre cable. Install and splice/test 3 x Fibre Nodes.
Roadworks description
Roadworks scheduled 20/09/2026 - 21/09/2026 (Fibrus Networks Limited)
Roadworks start time
Roadworks end time
Roadworks delays
longDelays
Roadworks organisation
Fibrus Networks Limited
Roadworks link
Roadworks comment
From 44m West of Wetheral Methodist Church to the Junction of The Cattle Grid