Roadworks location
Murray Road - Permanent reinstatement on interim blockage patch
Roadworks description
Roadworks scheduled 27/09/2026 - 27/09/2026 (Fibrus Networks Limited)
Roadworks start time
Roadworks end time
Roadworks delays
veryLongDelays
Roadworks constriction
roadBlocked
Roadworks organisation
Fibrus Networks Limited
Roadworks link
Roadworks comment
at the side of number 1 Finkle street