Roadworks location
Road Leading From Cliff Bridge To Howrigg Farm Via Smithfield - These works are for the installation of a new power cable in the existing duct route.
Access to joint pit locations required, rolling 2way signals
Access to joint pit locations required, rolling 2way signals
Roadworks description
Roadworks scheduled 28/09/2026 - 09/10/2026 (Global Utility Connections)
Roadworks start time
Roadworks end time
Roadworks delays
longDelays
Roadworks organisation
Global Utility Connections
Roadworks link
Roadworks comment
From the River Lyne to the junction with