Roadworks location
Ellenborough Road - Open cut excavation required to repair valve in the carriageway
Roadworks description
Roadworks scheduled 02/11/2026 - 04/11/2026 (United Utilities Water)
Roadworks start time
Roadworks end time
Roadworks delays
veryLongDelays
Roadworks organisation
United Utilities Water
Roadworks link
Roadworks geofield
POINT (-3.4782448 54.709713)
Roadworks geolocation
54.709713, -3.4782448
Roadworks comment
Outside 1, CA15 7RG